This mapping product is for informational purposes only and has not been prepared to be suitable for legal, engineering, or surveying purposes. It does not represent an on-the-ground survey and represents only the approximate relative location of property boundaries and project locations. Allworld PM makes no warranty, either implicit or explicit, as to the accuracy of the data presented.

DYS_02 Oakwood Drive Drainage Improvements

Project Extents: 200′ West of the Intersection of Oakwood Drive and Ridgewood Road

Actual Construction Dates: May, 2022- June, 2022

Project Description: This drainage improvements project consists of the repair of a yard inlet and a new connection to the main trunk line.

GHI_02 CIPP Rehabilitation of Pipe under CN Crossing over GE Patterson

Project Extents: GE Patterson from Front Street to Main Street

Actual Construction Dates: August, 2022- August, 2022

Project Description: This CIPP rehabilitation project consisted of the inspection and rehabilitation of the stormwater pipes under this railroad bridge.

WGL_01 Mysen Circle Drainage Improvements

Project Extents: Along Mysen Circle from 200′ south of Karlstad Cove to 200′ north of Karlstad Cove

Actual Construction Dates: April, 2023- June, 2023

Project Description: This drainage improvements project consists of increasing the size over 550 linear feet of pipe from 15″-18″ diameter concrete pipe to 24″-36″ diameter concrete pipe, adding 4 additional inlets, and an endwall.

TDC_01/TDC_02 St Elmo and Argonne Drainage Improvements

Project Extents: 150′ east of and 400′ south of the intersection of St. Elmo Avenue and Argonne Street

Actual Construction Dates: July, 2023- September, 2023

Project Description: This drainage improvements project consists of increasing the size of two cross-drains near the intersections of St. Elmo Avenue and Argonne Street.

GYS_03 Mill Avenue Drainage Replacement

Project Extents: Mill Avenue from Front Street to Main Street

Actual Construction Dates: April, 2023- April, 2024

Project Description: This drainage project consists of the abandonment of a failing drainage line under Mill Avenue and replacement along a new alignment.